Steel buildings designed, fabricated and erected as one system: large clear spans, fast construction and easy expansion for warehouses, factories, cold stores and commercial sheds.
A pre-engineered building is a steel structure whose frames, purlins, girts and cladding are designed as one system, fabricated in a factory to exact sizes, and bolted together on site.
Built faster, built to fit. Because members are designed for the actual loads and made off-site, a PEB usually goes up much faster than a conventional structure and uses steel efficiently.
Our architects and structural engineers handle the layout, approvals, foundation design and civil works, so the steel arrives to foundations that are ready for it.
Large clear spans for racking, docks and vehicle movement.
Production halls with crane runways and mezzanines.
Insulated panels and controlled environments.
Wide frontages and clean interiors.
Very large floor areas with interior columns.
Parking, loading bays and covered yards.
Built-up tapered columns and rafters that carry the main loads.
Z and C purlins and girts that support the roof and wall sheeting.
Colour-coated or galvalume sheets, with insulation if needed.
Rod or angle bracing for wind and stability.
Gutters, downpipes, skylights, ventilators, louvres and doors.
Anchor bolts and footings designed and built by our civil team.
Every PEB is designed for its site, loads and use. Final sizes are confirmed in the design. [Replace placeholders with your standard product data.]
Design, approvals, civil works, fabrication and erection, from one team.
Use, size, loads and site conditions understood.
Layout, structural design and a written quotation.
Our civil team builds footings and sets anchor bolts.
Frames and members fabricated and finished.
Bolted erection, cladding, accessories and handover.
A steel building whose frames, purlins and cladding are designed as one system, fabricated in a factory and bolted together on site.
It depends on size, design approvals and foundation work. Because members are made off-site and bolted together, erection is usually much faster than conventional construction. We confirm a schedule with the quote.
Yes. PEBs can be designed so that bays can be added later with minimal disruption.
Yes. Our structural engineers design the foundations and our civil team builds them, so the steel arrives to foundations that are ready for it.
Yes. Crane runways, mezzanine floors, insulation, skylights and ventilators can be built into the design.
Share the size, use and location. We will reply with next steps and a site visit within [X] working days.
Design, engineering, contracting and property valuation under one roof. Leave your number and a principal will call you back.
A principal replies within 4 working hours. No spam, ever.