A pre-engineered building (PEB) is a steel building whose frames, roof and wall members are designed for the exact building and made in a factory, then bolted together on site. For warehouses, factories and large sheds it is usually faster and lighter than conventional steel or RCC.
How PEB differs
- Tapered frames: built-up steel sections that are deep where the forces are high and slim elsewhere, so less steel is used than with standard rolled sections.
- Factory-made: members are cut, welded, drilled and painted in the factory, so site work is mainly foundations and bolting.
- Large clear spans: wide column-free floors suit storage, racking and machinery.
Where PEB works well
Warehouses and logistics parks, factory sheds, cold storage, showrooms, aircraft hangars and sports halls: single-storey buildings with large open floors, often with mezzanines or cranes.
Where RCC may be better
Multi-storey buildings with heavy floor loads, buildings needing high fire resistance without added protection, and small buildings where steel's speed advantage is small.
What drives the cost
- Clear span and eave height.
- Wind and earthquake zone of the site.
- Cranes, mezzanines and roof loads such as solar panels.
- Roof and wall sheeting type, insulation and skylights.
- Foundations, which depend on the soil.
Planning tips
Fix the layout, crane needs and future expansion early: a PEB is designed for its loads, and changing them later costs more than planning for them now.