Free tool · Design & Build

FSI (FAR) calculator

Find out how much floor area you can build on your plot. Enter the plot area and the FSI or FAR allowed by your local bye-laws, and add ground coverage and floors to see how it splits across the building.

Loading the calculator. If it does not appear, please enable JavaScript or contact us.

Explained

What is FSI and how is it calculated?

FSI (floor space index), also called FAR (floor area ratio), is the total floor area you may build divided by the area of the plot. An FSI of 2 on a 250 sq m plot allows 500 sq m of floor area across all floors. Some authorities write FAR as a percentage, so a FAR of 200 means the same as an FSI of 2.

FSI works together with ground coverage (how much of the plot the building may cover), setbacks and height limits. If ground coverage is 60%, a 250 sq m plot can have a footprint of 150 sq m, so you need four floors to use an FSI of 2 in full.

Each authority decides which areas count. Stilt parking, basements used for parking or services, lift wells, staircases within limits and some balconies are often left out, which means the built area can be larger than the FSI figure. Check the master plan and building bye-laws for your city.

FAQ

Questions

Is FSI the same as FAR?+

Yes. Both describe total floor area divided by plot area. FSI is usually written as a ratio (2.0) and FAR sometimes as a percentage (200). The calculator accepts either.

Where do I find the FSI for my plot?+

In the master plan and building bye-laws of your development authority or municipal body. It depends on the zone, plot size, road width and use. An architect can confirm it for your plot.

Can I build more than the permitted FSI?+

Some cities let you buy additional FSI or use transferable development rights (TDR) for a fee. Building beyond the permitted FSI without approval can lead to penalties, demolition orders and problems with loans and sale.

Why can I not use the full FSI on my plot?+

Height limits, setbacks, ground coverage or parking rules can stop you reaching the full FSI. The binding limit varies by plot, so a feasibility check looks at all of them together.

Start a project →Request a valuation →Start a project →Request a valuation →
A principal replies within 4 working hours.
+91 93115 98688 · Call or WhatsApp