Valuation · Land compensation

Land compensation for power transmission lines

Independent land valuation for tower footings and line corridors (right of way) across India, for landowners, transmission companies and state utilities. We have valued land for projects of Power Grid, Sterlite Power and HVPNL.

Overview

How is compensation for transmission lines worked out?

Transmission lines do not usually involve buying the land. The line company places towers and runs the line across the land under powers given by the Electricity Act, 2003, and pays compensation for the land used. Under the Ministry of Power guidelines of 14 June 2024 for lines of 66 kV and above, compensation is 200% of land value for the tower base area and 30% of land value for the corridor under the line.

Everything depends on the land value used. Where circle rates are well below what land actually sells for, the compensation falls short. A market value assessment backed by sales evidence is the basis for a fair figure.

The Ministry has since issued supplementary guidelines, including higher corridor rates for inter-state lines in some urban areas, so we confirm the rules that apply to each line before valuing.

When you need it

When do you need a compensation valuation?

Landowners on a new line

Check the compensation offered for towers and the corridor.

Transmission companies

An independent land value for compensation along a route.

State utilities

Values for lines built by state transmission companies.

Disputed amounts

Market value evidence when compensation is contested.

Crops, trees and structures

Damage to crops, trees and structures assessed with the land.

Substation land

Valuation of land bought or acquired for substations.

Deliverables

What does the report include?

01

Route and land records

Survey numbers, areas and ownership along the line, from the record of rights.

02

Site inspection

Tower locations, corridor, land use, crops and access seen on site.

03

Sales evidence

Recent comparable sales and local market enquiries near the route.

04

Land value

Market value per acre or hectare, compared with the circle rate.

05

Compensation working

Tower base and corridor amounts under the applicable guidelines.

06

Signed report

Maps, photographs, method and our membership details.

Process

How does the valuation work?

Records first, then the route, then a clear report.

  1. 01

    Purpose and documents

    START

    Line details, tower schedule and land records shared.

  2. 02

    Record check

    DESK

    Areas, ownership and land use reviewed.

  3. 03

    Site visit

    SITE

    Tower sites and corridor inspected.

  4. 04

    Signed report

    REPORT

    Report issued with values, compensation working and evidence.

Documents

What documents are needed?

  • Record of rights for each parcel (Jamabandi, Khatauni, 7/12 or the state equivalent)
  • Tower location and line route drawings, if available
  • Survey or village map
  • Notice or letter from the transmission company, if any
  • Details of crops, trees, wells and structures affected
  • Any compensation already offered or paid
Fees

What affects the fee?

  • Number of parcels and towers
  • Length of the route and travel
  • Purpose of valuation
  • Turnaround required

We share a written proposal with scope, fee and timeline.

Engagement lead

Our valuation team

Engineers and valuers

IOV RVF member (Land & Building)

Why us

Why choose us for line compensation

Pan-India work

Land valued for transmission projects across India.

Field-based

Every valuation includes a site visit; no desk-only figures.

Evidence, not guesses

Values backed by sales evidence and land records.

FAQ

Power line compensation questions

How much compensation is paid for a transmission tower?+

Under the Ministry of Power guidelines of 14 June 2024, 200% of land value for the tower base area: the area between the tower legs plus one metre on each side.

What is paid for the corridor under the line?+

30% of land value for the right-of-way corridor under the June 2024 guidelines. A March 2025 supplement allows higher corridor rates for inter-state lines in municipal and metropolitan areas where circle rates are below market rates.

Which lines do the guidelines cover?+

Transmission lines of 66 kV and above. Sub-transmission and distribution lines are not covered.

Is the land acquired for the line?+

Usually not. The owner keeps the land and can keep farming it, with limits on building under the line. Land for substations is generally bought or acquired.

Do you need to visit the land?+

Yes. A site visit is essential to confirm tower locations, land use, crops and access.

Enquiry

Request a compensation valuation

Share the line, location and number of parcels and we’ll reply within 4 working hours with the fee and next steps.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Start a project →Request a valuation →Start a project →Request a valuation →
A principal replies within 4 working hours.
+91 93115 98688 · Call or WhatsApp